The purpose of this standard is to:

Achieve consistency in the cost accounting practices used by a contractor in estimating costs for its proposals with those practices used in accumulating and reporting costs during contract performance, and
Provide a basis for comparing such costs.

Includes consistency in the structure and level of detail in accumulating and estimating costs.